From permit to build, your drawing set

We prepare the permit design, run the correspondence with the authorities and hand over construction drawings the site team can build from directly.

  • Permit design preparation
  • Municipality and authority follow-up handled
  • Revisions closed without delay
Where It Goes Wrong

What delays a permit is usually not the design but the follow-up

Knowing which authority to approach, in what order and with which attachments is half the job. Most delays come not from a technical error but from missing paperwork, the wrong application order or a late reply to the authority. We build a complete file and follow it until it closes.

We prepare permit designs and take on the correspondence with the municipality and the relevant authorities. Construction drawings are produced in enough detail for the site team to build from, and revision requests are closed without delay so you manage the process through a single contact.

  • A complete application file
  • Authority correspondence followed
  • Revision requests closed quickly
  • Drawings detailed enough to build from
Scope

The designs we prepare

From permit stage to fabrication, the whole file runs through one hand.

  • 01

    Permit designs

    Drawing sets prepared to the relevant regulation and submitted with the permit application.

  • 02

    Construction drawings

    Fabrication drawings detailed enough for the site team to build from directly.

  • 03

    Fabrication details

    Enlarged details of critical points; dimensioned drawings that need no interpretation on site.

  • 04

    Authority correspondence

    Applications, comments and approval correspondence with municipalities and public bodies.

  • 05

    Revision management

    Incorporating authority comments into the design and resubmitting the file.

  • 06

    As-built and handover file

    Drawings brought to their final state after construction, plus the documents needed for acceptance.

A few lines are enough for a survey and a quote

Leave your number and we will call back the same day. The survey is free; the quotation comes itemised, with quantities and lead times.

  • Free site survey
  • Itemised, transparent quotation
  • One contact, one schedule

Your details are used only to respond to this request.

Process

From file to permit

  1. 01

    Regulation and requirement review

    We determine which designs are needed and in which order each authority must be approached.

  2. 02

    Design preparation

    Calculations are made, drawings produced to regulation and then checked.

  3. 03

    Application and follow-up

    The file is submitted; comments and revision requests are answered without delay.

  4. 04

    Approval and construction set

    The approved design is handed over with fabrication details, ready for site.

Permits & Construction Drawings
Technical Summary

What is delivered

Design types
Permit design, construction drawings, renovation design
Disciplines
Electrical, mechanical, structural, architectural
Authorities
Municipality, distribution company and relevant public bodies
Drawing environment
AutoCAD-based design production
Level of detail
Dimensioned fabrication detail requiring no interpretation on site
Deliverables
Approved drawing set, fabrication details, as-built file
Suitability

Who is it for?

Permit designs, construction drawings and authority follow-up.

Get a Quote
  • Investors applying for a building permit
  • Renovation and conversion projects
  • Contractors and construction firms
  • Business licence processes
  • Facilities increasing capacity
  • Works under public tender
About the Permit Process

Frequently asked

All frequently asked questions
  • It depends on the authority workload and how complete the file is. The part under our control — preparing the design and closing revisions — is run so that it adds no delay.

  • Yes. We submit the application, follow the comments, incorporate revisions and resubmit. You track it through a single contact.

  • A permit design is for approval, a construction drawing is for building. A site team cannot work from a permit design; dimensioned fabrication detail is required. We prepare both.

  • Yes. The approved design can be executed under our electrical contracting and interior scopes, so nothing is lost between the drawing and the site.

Let's work together Let us talk about your project

One point of contact from survey through to commissioning. Tell us what you need and we will define the scope together.

Our References

Organisations we have worked with

From public institutions to retail chains, hotels and schools — we have delivered projects at every scale. Our work is in the facilities below.

  • Republic of Türkiye Ministry of Health
  • Erbil Cancer Hospital
  • EGO General Directorate
  • Ankara Metropolitan Municipality
  • City Gross
  • Boston Drink & Dessert
  • Gua Coffee Company
  • Coffee Lab
  • Mackbear Coffee Co.
  • YDA Center
  • MBA Schools
  • Hattuşa Ayaş Thermal Hotel
  • Nata Vega Outlet Mall
  • Bala Municipality