Skip to content
Service area

Solar energy systems in Yozgat

Installation, design and utility approval processes in Yozgat and the surrounding area, from feasibility through to commissioning.

  • Akdağmadeni
  • Divanlı
Yozgat

What we have built in Yozgat

In Yozgat we have worked on buildings away from the grid: a greenhouse operation and a detached house. In both, bringing the grid out cost more than the installation itself, so the systems were built to run without it.

Each of these jobs has its own page, with photographs, specifications and scope.

Service area

Districts we have worked in

We have completed work in these districts, and cover the rest of the province with the same team.

  • Akdağmadeni
  • Divanlı

What we do

  • Feasibility and consumption analysis
  • Solar design and approval processes
  • Battery storage systems
  • EV charging station installation
Solar Energy Systems
Price

What determines the price of a solar energy system?

Even two systems of the same size can come out at different prices, so instead of a fixed list price we give an itemised quotation after a free site survey. The main factors are:

  1. 01

    System size (kW)

    Calculated from your annual electricity use, the orientation and pitch of the roof, and the hours of sun in your region. Oversizing is wasted cost; undersizing is lost generation.

  2. 02

    Grid-connected or off-grid?

    A grid-connected system does not need storage. An off-grid system needs batteries to carry energy into the night and cloudy days, and batteries are a significant part of the cost.

  3. 03

    Battery capacity

    Set by how long, and which loads, you want to run without sun. The more storage you need, the larger and more expensive the battery bank.

  4. 04

    Panel and inverter choice

    Panel technology, efficiency rating and inverter type affect both the installed price and how much the system generates over the years.

  5. 05

    Roof and mounting

    Tiled, trapezoidal metal or concrete roof; a ground frame for field installations. The mounting surface and access set the labour and materials.

  6. 06

    Design and utility approval

    For grid-connected systems, design work and distribution-company approval are part of the installation. Systems with no grid connection keep this line simpler.

The survey is free. The quotation lists panels, inverter, batteries, structure, cabling, design and approval separately, so you can see what you are paying for.

For your project in Yozgat

Call or message us on WhatsApp for an on-site survey; we reply the same day.

Let's work together Let us talk about your project

One point of contact from survey through to commissioning. Tell us what you need and we will define the scope together.

Call WhatsApp
Our References

Organisations we have worked with

From public institutions to retail chains, hotels and schools — we have delivered projects at every scale. Our work is in the facilities below.

  • Republic of Türkiye Ministry of Health
  • Erbil Cancer Hospital
  • EGO General Directorate
  • Ankara Metropolitan Municipality
  • City Gross
  • Boston Drink & Dessert
  • Gua Coffee Company
  • Coffee Lab
  • Mackbear Coffee Co.
  • YDA Center
  • MBA Schools
  • Hattuşa Ayaş Thermal Hotel
  • Nata Vega Outlet Mall
  • Bala Municipality